The industry template for this document comes with a timetable that fits in one sentence. The organiser sends the event specifications guide to every venue and supplier at least four weeks before the event. They return their completed orders, such as banquet event orders, no later than two weeks before (APEX Event Specifications Guide Template, Convention Industry Council, 2005). Those two weeks are the only window in which the venue’s paperwork can be checked against yours.
Many planners never use that window, because there is nothing to check against. The details reach the venue as a chain of emails, a seating sketch and a spreadsheet of dietary needs. The venue rebuilds the event from those fragments, and you discover what it misread at half past seven on the first morning.
Give the venue one complete set of specifications, with a sheet for each function. When something changes, date the revision so the catering, operations and technical teams can all check which instructions apply. The downloadable Word template includes a separate sheet for the 1:1 meeting area, a detail the standard forms leave out.
What an event specifications guide is
An event specifications guide (ESG) is the document an organiser sends to the venue and its suppliers after the contract is signed. It describes every requirement of the event: who attends, which rooms are used when, how each room is set, what is served and who may sign for extras.
The term comes from APEX (Accepted Practices Exchange), the standards programme of the Convention Industry Council. The council approved the template in September 2004 and renamed itself the Events Industry Council in 2017. In older contracts you may still find the word “resume” for the same document. The APEX template has four parts:
- Part I, the narrative: a general overview of the event.
- Part II, the function schedule: a timetable of all functions that make up the event.
- Part IIIa, the function set-up order: one specification sheet per function.
- Part IIIb, the exhibitor version: the same sheet for a single booth or stand.
A function, in APEX language, is any organised occasion within the event: a breakout session, the registration area, the coat check, a rehearsal, a green room. Hotels and conference centres answer with banquet event orders (BEOs), often called function sheets, one per function, written for their kitchen, banqueting and technical teams.
Picture the person who receives it: the conference services manager at your venue. She reads the whole document once, on a Thursday afternoon. Then she splits it into orders for six departments, and nobody reads the whole guide again.
Everyone reads their own page.
Where it sits between RFP, contract and run of show
Because each department reads only its own page, the guide has to be clear about its job. Five documents are often confused:
| Document | Written by | When | Question it answers |
|---|---|---|---|
| RFP (request for proposal) | Organiser | Before the contract | Who can host this event, and at what price? |
| Contract | Venue, signed by both | After selection | What is promised, and what does it cost? |
| Event specifications guide | Organiser | After the contract, weeks before the event | What exactly do we need, room by room and hour by hour? |
| Banquet event orders | Venue | After the guide arrives | How will each department deliver it? |
| Run of show | Organiser | Final weeks | Who does what, minute by minute, on the day? |
The RFP comes first and asks suppliers to quote on the same basis. That is why our guide to the event RFP treats it as a brief for a price, not for a set-up. The run of show is your team’s internal plan, with cues the venue does not need, as our run of show template for a B2B conference shows. The specifications guide sits between them and turns the promises of the contract into instructions.
It does not rewrite the contract. The APEX template itself tells all parties to consult the relevant contract, because it could override the guide. Anything beyond the contract is a new order with a new price. This article is general information, not legal advice.
When to send it, and to whom
Those four weeks in the APEX template are a minimum. Large venues may want a first draft much earlier and then work in stages. The Event Planning Guide of the Los Angeles Convention Center sets out a typical sequence, and the guide is incorporated by reference in the centre’s licence agreement:
Event specifications at a large convention centre: four stages
- 7 to 11 months Send a first draft Event specifications, room sets and the programme agenda go to the event manager assigned to your event.
- 1 to 2 months Send the final version Final specifications, production schedules and agenda, plus a tie-down meeting with the event manager.
- 2 to 3 weeks Update and confirm Updated final specifications and room sets go in, and catering guarantees are confirmed.
- Final week Report every change Any change or adjustment to the event requirements goes to the event manager the same day.
A hotel with three meeting rooms will ask for less, and later. Ask for the deadlines while you negotiate the contract, and add them to the timeline in your event planning checklist.
Send the guide to everyone who delivers something on site: the venue, a separate caterer, the AV (audio visual) company, the decorator, security and transport. APEX recommends that every facility and vendor receives a complete copy of the final guide. An AV company that sees the room set can warn you that its rear projection screen will not fit behind the stage where you placed it.
What goes into each part
Once the recipients are clear, the content follows. Each part answers a different question for the venue.
Part I: the overview
The narrative describes the event as a whole. The APEX template lists 24 sections here, from the event profile to the authorised signatories. You will not need all of them, but a few fields are marked as required for good reason:
- Key contacts: at least one person with decision rights who can be reached throughout the event, plus an emergency contact.
- Attendee profile: numbers, countries, languages and access needs. A venue that knows half the delegates arrive from the airport plans luggage storage early.
- Housing: each room block with dates, rates and booking method. The latest pick-up figures belong here too, for the reasons our guide to hotel attrition clauses and room blocks explains.
- Safety and security: emergency instructions and the person who decides in a crisis.
- Billing: what goes on the master account and what delegates pay themselves.
- Authorised signatories: the people who may order extras on site. Without this field, anyone wearing your badge can add a coffee break to your bill.
Part II: the function schedule
The function schedule lists every function in time order: date, start and end, name, room, set-up style, attendance and the times for setting up and clearing. Add build-up, rehearsals, storage and staff offices. If it needs a room, it belongs on the schedule.
The conference services manager checks this page first, because it reveals conflicts: two functions in one room, or a changeover from theatre to banquet in 30 minutes.
Part III: one set-up order per function
Each function then gets a sheet of its own. The APEX function set-up order has 14 sections; these are the ones venues ask about most:
| Section | What to specify | What happens without it |
|---|---|---|
| Room set-up | Seating style, number of seats, stage, lectern, a set-up diagram | The room is set for the contracted maximum, not for your session |
| Audio visual | Microphones, screens, projection, streaming, internet | The equipment arrives, but not where the speaker stands |
| Food and beverage | Times, menu, numbers, service style, dietary needs | The buffet opens while the session is still running |
| Accessibility | Step-free routes, reserved seats, hearing loops | Requests made at registration never reach the room |
| Billing | Which account pays for this function | Extras land on the wrong invoice |
Give seat numbers that match the venue’s capacity chart for the chosen layout. The same room holds very different numbers in theatre or cabaret style, as our guide to event seating styles shows.
The function standard templates leave out: the meeting area
The APEX forms were written for sessions, meals and exhibitions. Scheduled 1:1 meetings rarely get a sheet of their own. The meeting area then appears as “networking area, cocktail tables”, and the venue sets exactly that.
Think about what delegates need. A buyer has a meeting at table 23 at 10:40. Table 23 has to exist, carry a visible number, have two chairs and be quiet enough to talk. At 11:00 the next meeting starts at a table without the last round’s cups.
Give the meeting area its own set-up order with these details:
- Number of tables, chairs per table and the table numbering, matching the meeting schedule.
- Opening hours per day, the length of each round and the gap between rounds.
- Clearing between rounds, so that cups and glasses do not pile up during a block.
- Signs to the area and a desk where delegates can ask about their next meeting.
- Power and Wi-Fi, and distance from the loudest part of the exhibition.
The numbers come from the meeting schedule, not from a guess. If 180 meetings are booked in the busiest round, 150 tables are not enough. Our guide to the meeting area at trade shows and congresses shows how to plan capacity and signage.
Tables are the product. Specify them like one.
Solution: Delegates arrange their meetings in Converve in advance, through a meeting matrix whose rules you set as the organiser. Converve schedules confirmed 1:1 meetings without clashes and assigns tables and rooms, and each personal agenda shows the table number. So the meeting schedule tells you how many tables you need per round and day before your specifications are due. See how it works on our B2B matchmaking page.
Food and beverage: numbers, guarantees and allergens
For each meal, the venue needs to know how many people you are prepared to pay for. Most venue contracts work with a guarantee: the number of covers you commit to pay for, confirmed by a set date. At the Los Angeles Convention Center, initial guarantees go in one to two months before the event. They are confirmed two to three weeks before (Los Angeles Convention Center, Event Planning Guide, 2025). Your contract sets the exact dates, so put them in the guide next to each meal.
For every meal, give the time, the expected number, the guarantee date and the service style. Pass on dietary requirements from registration as counts per meal, not as a list of names: 14 vegetarian, 6 vegan, 3 gluten free, 2 nut allergies.
Allergens need their own line. In the UK, a food business must provide allergen information for every non-prepacked item that contains any of the 14 regulated allergens. At a buffet, that applies to each dish separately (Food Standards Agency, allergen guidance for food businesses, updated 23 November 2026). The duty sits with the venue or its caterer. Your guide should still ask for every dish to be labelled, so that delegates do not queue to ask staff.
Picture 12:30 on day one, when 380 delegates leave the plenary at once. “Lunch 12:30, buffet” may get you two buffet lines. “380 covers, released at once, four lines, labelled per dish” lets the venue plan for that peak.
The guide decides what the queue looks like.
Changes: one document, dated revisions
No guide survives the last four weeks unchanged. A speaker cancels, a session moves rooms, registration closes at 420 instead of 380. The question is how the guide changes.
The APEX template answers it: when the published document changes, add a revised date and highlight and date each change in the text. In practice, three habits keep that manageable:
- One file, one owner and one version number, both in the file name and on the cover page.
- Every change marked and dated in the text, so the venue sees what is new.
- Every revision sent to all recipients, not only to one department.
The conference services manager reprints her orders from your revision. If the kitchen works from version 3 and banqueting from version 5, the mistake starts with the guide.
Two meetings close the loop, and the APEX narrative has a date field for each. At the pre-event meeting, often called the pre-con, you go through the function schedule line by line with every department head. The post-event meeting checks the final bill against the guide while everyone still remembers what was ordered.
Download the event specifications guide template
The template follows the structure of this guide and adds the meeting area that standard forms leave out.
Event specifications guide template
A cover page with version and distribution list, an event overview with contacts, attendee profile, housing, safety and billing, a function schedule, a set-up order for each function, a set-up order for a 1:1 meeting area, a catering and dietary summary, a revision log and a checklist before sending. Edit it in Word or Google Docs.
Free to use. No sign-up.
Conclusion: write the document your venue works from
Send the complete specifications to everyone delivering the event at least four weeks beforehand, or earlier if the venue asks. Give the meeting area the same attention as the plenary room, with a separate sheet for each function. Date every revision so the conference services manager can see exactly which instructions to put in the orders for the day.
If your event is built around scheduled 1:1 meetings and you want the meeting schedule to feed your venue specifications, get in touch with Converve.
Frequently Asked Questions
What is an event specifications guide?
An event specifications guide (ESG) is the document an organiser sends to the venue and its suppliers after the contract is signed. It gives an overview of the event, a schedule of all functions and a set-up sheet for each function. The term comes from the APEX accepted practices of the Events Industry Council.
How far in advance should I send the event specifications guide?
At least four weeks before the event, with the venue’s orders back two weeks before (APEX Event Specifications Guide Template, 2005). Large venues may want a first draft earlier: the Los Angeles Convention Center asks for one 7 to 11 months ahead (Los Angeles Convention Center, Event Planning Guide, 2025).
What is the difference between an event specifications guide and a BEO?
The organiser writes the specifications guide. The venue turns it into banquet event orders, also called function sheets, one per function for its own departments. Check every BEO against your guide before you sign it.
Does the event specifications guide replace the venue contract?
No. The contract stays the binding document, and APEX advises all parties to consult it because it can override the guide. Anything beyond the contract is a new order that needs the venue’s confirmation.